Fashion electric scooter for two seats 48v two wheel electric bicycle on sale faster e motorcycle with two people
Main components | |
Motors available: | 800W brushless hub motor |
Battery: | 48V/60V/72V 20Ah battery |
Controller: | intelligent 12 tube controller |
Charger: | 5A Smart Charger, 110V/220V |
Brakes: | Front and rear disc brake |
Suspension: | Front hydraulic /rear spring |
Tires: | 3.00-10 vacuum tire |
Performance | |
Charging time: | 5-6 hours |
Recharging cycles: | 1000 times |
Max speed: | 45km/h |
Driving distance per charge: | 50-60km |
Loading capacity: | 150kg |
Climbing capacity: | 15% |
Dimension: | 1980*700*1100mm |
Wheelbase: | 1390mm |
Grand clearance: | 140mm |
Packing | |
G.W.: | 105kg |
N.W.: | 95kg |
Packing: | Iron packing frame & Carton |
Carton size: | 1900*580*860MM |
Container loading QTY: | 90units/40'HQ |
24 hours online service
OEM & ODM are welcome
tried orders are available
No matter big or small order, we will provide you with all the best quality and best service.
If any problems for our products, which can't be used normally, they will be sent free in the next order.
After sale service
1.1 year warranty normally, for motor, controller;
2. 2--5% easily damaged parts for free when full container order
3. We will replace the broken parts with new parts in the next order
4. Choose the cheapest and safest shipping company
5. Track each order until you get goods
6. Welcome any feedbacks and advice for our products.
FAQ :
1.Are your company a trading one or a factory?
Factory + trade (mainly factories, so the quality can be ensured and price competitive)
2.How long have your company run on tricycle?
10 years focusing on tricycle,5 years exporting experience.
3,Which payment terms are you accept?
Payment Terms: T/T, or cash
4.After an order is placed, when to deliver?
it will be decided by the time of the factory production and your quantity.Normally around 15 days.
5.If the products are not conformity with requirements, how to solve?
If the products are not conform to customer samples or have quality problems, our company will be responsible for it.
6.What about the cooperation process?
Confirm details of order, 30% deposit, Arrange production, pay the balance, shipment.